2 MT HQT Plant
- Equipment: HQT Plant
- Capacity: 2 MT
- Maximum Temperature: 1000°C
- Fuel: Gas Fire
- Application: Hardening Tempering Quenching
- Commissioned: 2024
50 MT Gas Fired Bogie Hearth Furnace
- Equipment: Hardening Tempering furnace
- Capacity: 50 MT
- Maximum Temperature: 940°C
- Fuel: Gas
- Application: Gas Fired Bogie Hearth Furnace
- Commissioned: 2023
4 MT Electrical Bogie Hearth Normalizing Furnace (Double Trolley)
- Equipment: Heat treatment furnace
- Capacity: 4 MT
- Maximum Temperature: 950°C
- Fuel: Electrical
- Application: Double trolley Bogie Hearth normalizing furnace
- Commissioned: 2025
5 MT Twin Bogie Stress Relieving Furnace
- Equipment: Bogie Hearth furnace
- Capacity: 5 MT
- Maximum Temperature: 800°C
- Fuel: Electrical
- Application: Stress Releasing
- Commissioned: 2022
1.5 Hardening & Tempering Furnace
- Equipment: Heat treatment furnace
- Capacity: 1.5 MT
- Maximum Temperature: 1000°C
- Fuel: Gas Fired
- Application: Hardening & Tempering Furnace
- Commissioned: 2025
1 To 1.5 MT Dual Fired Ladle Preheater
- Equipment: Ladle pre heater
- Capacity: 1 to 1.5 MT
- Maximum Temperature: 1000°C
- Fuel: Gas & Oil
- Application: Dual Fired Ladle Pre heater
- Commissioned: 2024
5 MT Electrical Hardening, Tempering Furnace with Manipulator
- Equipment: Heat treatment furnace
- Capacity: 5 MT
- Maximum Temperature: Hrdening 1000°C/Tempering 750°C
- Fuel: Electrical
- Application: Hardening Tempering Furnace with manipulator
- Commissioned: Pending From Client side
1.2 MT HQT Plant
- Equipment: Heat treatment furnace
- Capacity: 1.2 MT
- Maximum Temperature: Hardening 970°C, Tempering 730°C
- Fuel: Gas Fired
- Application: Hardening Quenching Tempering
- Commissioned: 2024
1.5 MT 8 Nos Furnaces with Manipulator
- Equipment: Heat treatment furnace
- Capacity: 1.5 MT (Total 8)
- Maximum Temperature: Hardening 880°C / Tempering 550°C
- Fuel: Electrical
- Application: Hardening & Tempering
- Commissioned: 2025
3.5 MT Electrical Fixed Hearth Tempering Furnace
- Equipment: Heat treatment furnace
- Capacity: 3.5 MT
- Maximum Temperature: 750°C
- Fuel: Electrical
- Application: Fixed Hearth Tempering Furnace
- Commissioned: Pending From Client side
5 MT Double Door Double Bogie Furnace
- Equipment: Heat treatment furnace
- Capacity: 5 MT
- Maximum Temperature: 1000°C
- Fuel: Electrical
- Application: Quenching Furnace
- Commissioned: 2024
5 MT Rapid Quenching Furnace
- Equipment: Heat treatment furnace
- Capacity: 3.5 MT
- Maximum Temperature: 750°C
- Fuel: Electrical
- Application: Fixed Hearth Tempering Furnace
- Commissioned: Pending From Client side
5 MT Electrical Bogie Hearth Furnace
- Equipment: Hardening & Tempering Furnace
- Capacity: 5 MT
- Maximum Temperature: 800°C
- Fuel: Electrical
- Application: Bogie Hearth Furnace
- Commissioned: 2024
10 MT Bogie Hearth furnace
- Equipment: Heat treatment furnace
- Capacity: 10 MT
- Maximum Temperature: 700°C
- Fuel: Electrical
- Application: Bogie Hearth Furnace
- Commissioned: 2025
5.5 MT Electrical Bogie Hearth Furnace
- Equipment: Heat treatment furnace
- Capacity: 5.5 MT
- Maximum Temperature: 1100°C
- Fuel: Electrical
- Application: Bogie Hearth Furnace
- Commissioned: 2022
20 MT Bell Furnace
- Equipment: Heat treatment furnace
- Capacity: 20 MT
- Maximum Temperature: 1000°C
- Fuel: Electrical
- Application: Bell Furnace
- Commissioned: 2025
8 MT Gas Fired Rapid Quenching Furnace
- Equipment: Heat treatment furnace
- Capacity: 8 MT
- Maximum Temperature: 1100°C
- Fuel: Gas
- Application: Rapid Quenching Furnace
- Commissioned: 2023
35 MT Bogie Hearth Furnace
- Equipment: Heat treatment furnace
- Capacity: 35 MT
- Maximum Temperature: 920°C
- Fuel: Gas Fired
- Application: Bogie Hearth Furnace
- Commissioned: 2025
7.5 MT Double Hardening Furnace with Manipulator
- Customer: Bander Saeed Ali Lahini
- Equipment: Heat treatment furnace
- Capacity: 7.5 MT
- Maximum Temperature: 1100°C
- Fuel: Electrical
- Application: Hardening Furnace with Manipulator
- Commissioned: 2022