Short answer: A temperature uniformity survey (TUS) places calibrated thermocouples across a furnace’s work zone and records them at operating temperature to prove that every point stays within a stated tolerance — for example ±6 °C for an AMS2750 Class 2 furnace. The survey defines the usable work zone, fixes the furnace class, and must be repeated at a set interval to keep the furnace qualified.
If you supply aerospace, automotive, oil and gas or defence customers, a current TUS report is usually the first document an auditor asks for. This guide explains what the survey proves, how it is carried out, and what to do when a furnace fails one.
Why temperature uniformity matters
A furnace controller displays one number from one thermocouple. Your parts sit everywhere else in the chamber. If a corner of the load runs 15 °C cold, those parts can come out under-tempered or with a different hardness from the rest of the batch; in carburising, case depth drifts with temperature, and near the critical temperature a cold spot can leave unwanted ferrite in a hardened structure.
The TUS replaces “the controller says 860 °C” with evidence that the whole zone is at 860 °C, within a known band. That is why SAE AMS2750 (the pyrometry standard behind Nadcap heat treating accreditation) and AIAG CQI-9 (the automotive heat treat assessment) both make it mandatory. For what each standard asks of the furnace itself, see our guide to AMS2750 and CQI-9 requirements.
TUS vs SAT: two different tests
The two tests are often confused. Both are required, and they answer different questions.
| System Accuracy Test (SAT) | Temperature Uniformity Survey (TUS) | |
|---|---|---|
| Question answered | Is the furnace reading correctly? | Is the furnace heating evenly? |
| What is checked | Controller, lead wire and sensor as one loop | The full qualified work zone |
| How | Test sensor placed next to the control sensor; readings compared | Many sensors spread through the zone; recorded over time |
| Result | Total loop error vs allowed limit | Hottest and coldest corrected readings vs class tolerance |
| Typical frequency | More frequent | Less frequent; set by class and instrumentation |
Furnace classes and uniformity tolerances
AMS2750 groups furnaces into six classes by the uniformity they can hold. The current revision is AMS2750H, published in July 2024. Your material or process specification decides which class you need — not the other way round.
| Furnace class | Uniformity (°C) | Uniformity (°F) | Typical fit (indicative) |
|---|---|---|---|
| Class 1 | ±3 | ±5 | Most demanding aerospace processes |
| Class 2 | ±6 | ±10 | Aluminium solution treatment and ageing, precision aerospace work |
| Class 3 | ±8 | ±15 | Hardening and tempering of critical steel parts |
| Class 4 | ±10 | ±20 | General hardening, normalising, annealing |
| Class 5 | ±14 | ±25 | Tempering, stress relieving, many ovens |
| Class 6 | ±28 | ±50 | Coarse processes where tight control is not specified |
Two practical rules follow. A furnace can be qualified in different classes over different temperature ranges. And a furnace must not run a process that needs a tighter tolerance than the class it has passed, even if it “usually” holds better on the day.
How a temperature uniformity survey is done
- Define the qualified work zone. Record the dimensions of the space where parts actually sit. Only this volume is qualified, so make it match your largest load.
- Select survey temperatures. Survey at the lowest and highest temperatures of the qualified operating range, adding intermediate temperatures when the range is wide, as the standard requires.
- Place the sensors. Start with the eight corners and the centre of the zone, then add sensors as the zone volume increases. Mount them on a rack or fixture and record each position in three dimensions.
- Use calibrated equipment. Every survey thermocouple and the data logger must carry current calibration, and the correction factors from their certificates are applied to the readings.
- Run under normal operating conditions. Use the same burners, fans, zone settings and door practice used in production, empty or with a representative load as your procedure states.
- Record through stabilisation. Data logging runs as the furnace approaches setpoint, through stabilisation and across the required soak, checking that no sensor overshoots the upper tolerance.
- Evaluate and locate. Compare the hottest and coldest corrected readings with the class tolerance, identify the hot and cold spots, and declare pass or fail.
- Issue the report. Document results and, where the instrumentation type requires it, move the recording sensors to the hot and cold spots found.
The recorded run is often around two hours per survey temperature, but planning and set-up take longer. Survey ports in the furnace wall or door, designed in from the start, make every future survey faster.
What a TUS report must contain
- Furnace identification, furnace class and instrumentation type
- Survey temperatures, date, and the qualified work-zone dimensions
- A diagram of sensor locations, plus control and recording sensor positions
- Calibration identification and correction factors for each survey sensor and the test instrument
- Time and temperature data from every sensor, identified as corrected or uncorrected
- Hottest and coldest readings after stabilisation, any overshoot, and a clear pass or fail
- Technician name and quality approval
How often you need a TUS
Under AMS2750 the survey interval is set by two things: the furnace class and the instrumentation type. Instrumentation runs from Type A, which records control, load and hot- and cold-spot sensors, down to Type E, which has a control sensor only. The tighter the class and the less instrumentation the furnace carries, the more often it is surveyed. As an illustration from AMS2750’s interval tables, a Class 2 furnace with Type B instrumentation needs a monthly TUS while a Class 5 furnace with the same instrumentation needs one quarterly, and a run of consecutive passes can lengthen the interval.
Separately, a new survey is required after any repair or modification that could change uniformity: a burner or element change, refractory repair, fan replacement or a new control system. CQI-9 applies its own frequencies through process tables for each heat treatment type, so automotive suppliers should check the table for their process.
Why furnaces fail a TUS — and the fixes
| Cause | What you see | Typical fix |
|---|---|---|
| Air leaks at door seals and openings | Cold spot near the door or sight ports | Reseal doors, repair sand or fibre seals, keep slight positive pressure |
| Poor gas circulation | Large spread at low temperatures (tempering, ageing) | Add or upgrade a recirculation (RC) fan and baffles |
| Burner tuning or element ageing | One zone persistently hot or cold | Retune fuel/air ratio; replace or rebalance heating elements |
| Zone control | Overshoot or slow stabilisation | Retune PID loops; move to multi-zone control |
| Degraded insulation | Hot shell patches, cold walls | Reline, often with low-thermal-mass ceramic fibre |
| Load and fixtures blocking flow | Fails loaded but passes empty | Redesign baskets and spacing; reduce fixture mass |
Low-temperature processes are the hardest to keep uniform in radiant-only furnaces, which is why convection designs such as our fixed box furnace with RC fan, bogie furnace with RC fan and pit type furnace with RC fan exist. Most of these fixes can also be applied to an older furnace through furnace modernisation.
Buying a new furnace? Put the TUS in the contract
Uniformity is decided at the design stage, not at the survey. In your enquiry, state the furnace class and instrumentation type, the qualified work-zone size, the temperatures to be surveyed, and that an initial TUS and SAT with full reports form part of commissioning. Ask how the design achieves uniformity — zoning, burner or element layout, circulation and survey access.
At Mass Engrs, multi-zone heating and engineered flow profiles are used to deliver uniformity of ±3 °C to ±5 °C where the process demands it, as described on our R&D page. See how quality is built in at every stage on our quality page, and the standards we work to under certifications and standards. If you are still choosing a furnace type, start with batch vs continuous heat treatment furnaces.
Frequently asked questions
What is a temperature uniformity survey?
A temperature uniformity survey (TUS) is a test in which calibrated thermocouples are placed across a furnace’s qualified work zone and recorded at operating temperature. It proves that every point in the zone stays within a stated tolerance, which sets the furnace class and the usable work volume.
What is the difference between a TUS and a SAT?
A system accuracy test (SAT) checks the measuring chain — controller, lead wire and thermocouple — at one point against a calibrated test sensor. A TUS checks the whole work zone. The SAT proves the furnace reads correctly; the TUS proves the furnace heats evenly. Compliant furnaces need both.
How long does a temperature uniformity survey take?
The recorded portion of a survey often runs around two hours per survey temperature, but preparation — fitting the sensor rack, checking calibrations and setting up the data logger — usually takes longer than the run itself. A furnace qualified at several temperatures needs a survey at each one.
How many thermocouples are needed for a TUS?
The minimum number depends on the volume of the qualified work zone and the standard being followed. A common starting pattern for a rectangular zone is one sensor at each of the eight corners plus one at the centre, with more added as the zone gets larger.
How often does a furnace need a TUS?
Under AMS2750 the interval depends on the furnace class and instrumentation type: tighter classes with less instrumentation are surveyed more often. Consecutive passed surveys can extend the interval. A new survey is also needed after any repair or modification that could affect uniformity.
What happens if a furnace fails a TUS?
The furnace cannot be used for processes that need the failed tolerance until the cause is found, corrected and a new survey passes. The usual causes are air leaks, poor circulation, burner or element problems and degraded insulation. Product processed since the last good survey may need review.
Talk to Mass Engrs
Need a furnace that passes its TUS first time, or an existing furnace brought back into class? Share your process, class and load details and our engineers will respond. Call 0233-2990599, email sales@mass-engrs.com, or use our contact page.
References
- SAE AMS2750H — Pyrometry (SAE International, revised July 2024)
- AIAG CQI-9 Special Process: Heat Treat System Assessment
- Performance Review Institute — Nadcap